About Plant

Our approach is distinctly informative. Hence we have added some details about this plant in the above PDF ( Please Download )

Download PDF

600 MW Electricity Generation
80% Turbine Capacity
99.9% Energy Production

Shiroro Hydroelectric Power station

The Shiroro Hydroelectric Power Station is a 600 MW generation plant which commenced operations in 1990 and in November 2013, NSP acquired the 30-year concession for the power station.
Shiroro Power Plc (“Shiroro”) is a hydroelectric power company located in Niger State of Nigeria. The Company was created as part of the successor companies involved in the privatization programme of the Federal Government of Nigeria.
Shiroro remains Nigeria’s most recent hydroelectric plant, hosting Nigeria’s SCADA operated national control center, switchyard facilities (including a technical “step down” function for the enhanced distribution into the national grid), advanced control room, and modern training facilities.

Additional Details

Country

Nigeria.

Location

Shiroro, Niger State

Coordinates

9°58′30″N 6°50′04″E.

Status

Operational

Commission Date

Year 1999.

Primary fuel & Capacity

Hydropower | 600 Megawatts.

Our Users Are Our Top Priority

Hence we will be adding more valuable and important data’s of our assets with some awesome images soon on our website, Please stay tuned.

About Plant

Our approach is distinctly informative. Hence we have added some details about this plant in the above PDF ( Please Download )

Download PDF

30 MW Electricity Generation
83 x 12.5MVA alternator Turbine Capacity
115GWH Typical Annual Energy Production

Gurara Hydroelectric Power Station

In May 2020, NSP acquired the 25-year concession for the Gurara Hydroelectric Power Station.
Gurara Hydroelectric Power Plant (“Gurara”) is located Kachia Local Government Area, Kaduna State, Nigeria.

Additional Details

Country

Nigeria.

Location

Kaduna, Nigeria

Coordinates

No Location Found

Status

Operational

Concession Date

Year 2017.

Primary fuel & Capacity

Hydropower | 30 Megawatts.

Our Users Are Our Top Priority

Hence we will be adding more valuable and important data’s of our assets with some awesome images soon on our website, Please stay tuned.

Driven By Values, Delivering On A Vision.